Data sync

A sync job moves data between goPrevina and another system in your company (for example, people from the HR or payroll program), in the direction and on the schedule you choose, mapped field by field.

1. What is on the screen

At the top, the “New sync job” button and the list of jobs. For a new company it says “No sync jobs yet.”.

When there are jobs, three status cards with their count appear above the list: “Failed”, “Disabled” and “No incidents”. Press one to see only those jobs; press it again to see them all. “Failed” counts the enabled jobs with a failed run or failures in a row.

2. Reading a row

Each row shows the job's name, “disabled” if its schedule is off, and the result of the last run: “succeeded”, “partial” (some records failed), “failed”, “blocked”, “running” or “never run”. Below are the direction, the schedule (or “manual only”) and the date of the “last run”. A “blocked” run is a full load that would remove more workers than the maximum set: it writes nothing until you review it.

3. Create a job

Press “New sync job” to open the form (it has its own guide). First you need an integration set up in “Integrations” that has a data connector, for example BambooHR, a file import or an exchange over SFTP, S3 or Azure Blob.

4. Run, edit and delete

To the right of each row are three icon buttons: “Run now” (runs the job without waiting for the schedule), “Edit” and “Delete”. Pressing the name also opens the job. “Delete” asks for confirmation and deletes the job, its schedule and its run history; this cannot be undone.

5. Failure alerts

Each job sends an e-mail alert when it fails several times in a row or goes too long without a successful run; the thresholds and recipients are set in the form. Open alerts are shown in “Integration monitoring”.