LOTO lockouts

“Active Lockouts (LOTO)” holds energy lockouts: the isolation of a piece of equipment before working on it, so nobody can start it while work is under way. Here they are created, verified point by point, applied and released.

1. The list and the cards

With no lockouts, the screen says “There are no lockouts yet” and offers “New lockout”. Once there are lockouts, three cards filter the list: “Applied”, “Draft” and “With unverified points” (drafts with at least one unverified point). Below are the search box (by number, equipment or location) and the status buttons “Draft”, “Active”, “Released” and “Emergency released”, each with its count.

Each row shows the number and the equipment; below, the location and how many points are verified; the status (“Draft” in grey, “Active” in red); and the date. A released lockout stays as the record of that isolation. If there are active LOTO permits with no lockout attached, a notice above the list names them. The “⋯” menu has “Open” and, on a draft, “Apply” (disabled while points remain to be verified) and “Delete”.

2. Create a lockout

Click “New lockout” (or “Lock out (LOTO)” on an equipment record). Choose the “Equipment” from the equipment register, write the “Reason or work to be done” and, if you wish, the “Location” and the “Person in charge”, who can be anyone on the staff. If the equipment has no CE marking, the form warns you.

Under “Isolation points”, use “Add point” to add one point for each energy source: “Energy type” (electrical, hydraulic, pneumatic, residual…), “Isolation device” (padlock, switch lockout, blind flange…), “Point location” and “Lock or tag no.”; “Remove” removes a point. At least one is needed. “Create lockout” saves the lockout as a draft.

3. Verify and apply

On the lockout record, the tab “Isolation points” lists the points. Click “Verify” on each one after checking there is no energy (try to start the equipment); tick “Residual energy has been dissipated (or there is none)” and, if you wish, add notes. Who verified and when is recorded.

“Apply” moves the lockout to “Active” and is enabled only when every point is verified; until then the record says how many are missing. The tab “Data” shows the reason, who created it and the release notes.

4. Release and emergency release

With the lockout “Active”, “Release” closes it after you confirm that the equipment can be re-energised and nobody is at risk; you can write “Release notes”. If a lockout has to be removed urgently without that step, “More” → “Emergency release” requires a reason (“Emergency release reason”) and is recorded separately. The history on the record shows who created, verified, applied and released the lockout.

5. Permissions

Creating, verifying, applying and releasing require edit permission. If your role does not have the Work permits and lockouts module, you see “This module is switched off”. A lockout created from a LOTO-type work permit shows a link to that permit on its record.